Program

Seminar in cooperation with Elekronik EP 2005.

This is an open seminar at EP 05, Älvsjö, Sweden, which you may join without any registration. Some presentations are repeated, and you
may enter when it suits you.

Presentation abstracts are listed here.

Tuesday 1 February
Time Title Company
10.00 Triple Play via enhanced DSL Acterna
10.30 Driving factors that cause Signal Integrity issues and how to solve them Orbis/Tektronix
11.00 Application Testing - Integration of Protocol stack and higher layers for multimedia mobiles Anritsu
11.30 Balanced measurements with Network Analyzers Rohde & Schwarz
12:00 Lunch  
14.00 The Impact of Low Voltage Technology on Electrical Test Teradyne
14.30 Future of Test Agilent
15.00 Boundary Scan in System Test SAAB Test Systems
15.30 Understanding AXI Acquisition Techniques and Image Quality Teradyne
16:00 End  
Wednesday 2 February
10.00 The Real Flying Prober: Problems & Solutions DESAB
10.30 Fiber Testing in the Future - Broadband distribution networks Acterna
11.00 Future of Test Agilent
11.30 Stop failures using HALT! DELTA
12:00 Lunch  
14.00 Ensuring BER Performance at Interfaces Using Timing Jitter Measurement Technologies Orbis/Tektronix
14.30 Smart signal analyzing with connectivity to simulation software Anritsu
15.00 Balanced measurements with Network Analyzers Rohde & Schwarz
15.30 Technologies for improving time-correlation in mixed signal measurements National Instruments
16:00 End  
Thursday 3 February
10.00 Challenges in Analyzing and Characterization of High Speed Serial Buses Agilent
10.30 Electrical and Optical Instruments: Acoustic Camera Acoutronic
11.00 Technologies for improving time-correlation in mixed signal measurements National Instruments
11.30 The Real Flying Prober: Problems & Solutions DESAB
     
14.00 Triple Play via enhanced DSL Acterna
14.30 Driving factors that cause Signal Integrity issues and how to solve them Orbis/Tektronix
15.00 Application Testing - Integration of Protocol stack and higher layers for multimedia mobiles Anritsu
15.30 Stop failures early using HALT! DELTA
16:00 End